Deck Shoring in progress at Level 7 Area 2
Rebar and MEP rough-in to start at Level 7 Area 2 on 5/2/22
Deck concrete placement at Level 7 Area 1 scheduled for 4/29/22
Rebar column cages and formwork in progress at Level 6 Area 3
MEPF equipment install in progress at Garage Level P5-Level 2