Deck shoring in progress at Level 24
Deck concrete placement at Level 24 occurred on 12/9/22
MEPF rough-in in progress through Level 24
Window Wall in progress at Level 17
Metal framing in progress at Level 15
Drywall pre-hang in progress at residential units Level 13
MEP wall and ceiling rough-in at residential units Level 12