December 12 - 16, 2022

  • Deck shoring in progress at Level 24

  • Deck concrete placement at Level 24 occurred on 12/9/22

  • MEPF rough-in in progress through Level 24

  • Window Wall in progress at Level 17

  • Metal framing in progress at Level 15

  • Drywall pre-hang in progress at residential units Level 13

  • MEP wall and ceiling rough-in at residential units Level 12