December 26 - 30, 2022

  • Deck shoring in progress at Level 27

  • Deck concrete placement at Level 27 to occur on 1/6/23

  • MEPF rough-in in progress through Level 26

  • Window Wall in progress at Level 19

  • Metal framing in progress at Level 17

  • Drywall pre-hang in progress at residential units Level 13

  • Interior wall insulation in progress at Level 10

  • Unit drywall in progress at Level 9