March 11 - 15, 2024

  • Paver waterproofing in progress at Level 37 Exterior

  • Climate control in progress at Level 37 Interior Amenity

  • Gym turf installed at Level 9 Exterior

  • Gym floor prep began at Level 9

  • Stone floor installation in progress at Level 1 Lobby

  • Partition door installation ongoing at Level 1 Lobby

  • Landscaping began within planters at Level 1 Exterior

  • Site work along Broadway in progress at Level 1 Exterior

  • Millwork in progress at P1 Mailroom

  • Dog Wash finishes in progress at P1

  • Punch list in progress at residential units 24-25

  • Office Elevator Lobby finishes in progress