March 18 - 22, 2024

  • Pool paver installation began at Level 37 Exterior

  • pool shower finishes in progress at Level 37

  • Trellis wood slat installation in progress at Level 37 Exterior

  • Yoga Room flooring in progress at Level 9

  • Stone floor installation in progress at Level 1 Lobby

  • Site work at Union Street in progress at Level 1 Exterior

  • Mailbox installation in progress at P1

  • Punch list in progress at residential unit Levels 26-27