March 7-11, 2022

  • Deck Shoring in progress at Level 5 Area 3

  • Rebar and MEP rough-in progressing at Level 5 Area 1

  • Deck concrete placement at Level 5 Area 1 scheduled for 3/14/22

  • Rebar column cages and formwork in progress at Level 4 Area 3

  • Mechanical and fire equipment installation in progress throughout Garage Levels