Pool shower finishes in progress at Level 37
Tile flooring and backsplash ongoing at Level 9 Amenities
Wood ceiling furring and z clips installation ongoing in preparation for wood panel installation at Level 1 Lobby
Site work formwork and City elements in preparation for concrete placement along Union Street at Level 1 Exterior
P1 Mailroom and Dog Wash tile flooring in progress
Residential Unit owner punch list in progress thru Level 22