Cabinets began at the Level 37 interior amenities
Fireplace wall tile installation in progress at Level 37
Exterior gates, handrails and benches have been installed at Level 37
Flooring in progress at Penthouses Levels 35-36
Fire pit Installation ongoing at Level 9
Accent lighting and final MEP connections in progress at Level 1 Lobby
Concierge desk construction began at Level 1
Residential unit owner punch list in progress through Level 27